Image: The front of the housing, with better access, addition of GP surgery, front garden (instead of road access) and wind turbines on the roof.
Image: Engagement work with the local community and an environmental report from Ecologic Architects resulted in positive changes for this new housing commissioned by the Local Authority including noise and vibration reduction from passing trains and retention of trees. The daylight studies resulted in the lowering of the height of the proposed buildings.